Capital Cost Estimator    
 Example    
 


The following will allow you to use the Capital Cost Estimator to produce a conceptual level capital cost for a crushing plant. The results are intended as a guide only. Supporting information including test work, engineering design, etc. are required to achieve industry accepted estimates to a Preliminary Economic Assessment, Pre-Feasibility and Feasibility levels.

To operate the “Capital Cost Estimator” complete the data below, press “Next” and complete the required inputs.

(Feed back is welcome. Please send any comments or suggestions to CapexEstimator@MQes.com)


Site Basis Details

Select Country
Job Site Conditions
Worker Skill Level
Work Week
Average Summer Temperature (Degress C)
Average Winter Temperature (Degress C)


 
 